Customization: | Available |
---|---|
Material: | Stainless Steel |
Usage: | Marine, Mining, for Firefighting, for Air Conditioner, Industrial, for Environment Protection |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Features:
* Linear structure reduces sheets transferring time and improve production efficiency.
* The material frame is controlled by the speed adjustable converter motor
* 10 Rollers for leveling and grooving which ensure the flatness of sheet metal for various thickness
* with material processing saving mode, users can reduce the waste of sheet metal significantly to less than 20mm per material
coiler.
* with features of servo motor driven in folding process and accurate positioning, it has the obvious advantage especially when pr
oduce the square shaped duct.
* The input adopt two modes: screen tough and keyboard input which ensure stability of the system.
* require only one person to operate the machine, two persons can take away the ducts.
* The speed of each part can be adjusted as needed.
* A processing counting function for statistics and management with day count and total count.
* support print function for production management.
Main Functions:
This line is mainly for producing square ducts with TDF flange/angle steel flange, the processing capacity is 1000-2000square me
ters per day. After input the dimensions of the ducts you want to process, then the machine can complete the following functions:
uncoiling, leveling, beading, notching and punching, shearing, pittsburgh locking, TDF flange forming/angle steel flange forming
and hydraulic folding.
Optional material auto stacking system
Details:
Technical Parameters:
Model | Capacity in mile-steel thickness range(mm) | Max width(mm) | Max-working speed(m/min) | Colier max weight (kg) |
Dimensions (mm) |
Power (kw) |
Weight (kg) |
HD-3-1250T | 0.5-1.2 | 1250 | 15 | 6000 | 2200*1800*1300 | 10 | 4500 |
2500*1800*1500 | |||||||
HD-3-1530T | 0.5-1.2 | 1350 | 15 | 6000 | 2200*2000*1300 | 12 | 5000 |
2500*2200*150 |
Packing Detail:
Each Duct auto line 2 with plastic film package first, then placed in a wooden case, wooden case with a foam filling.
We loaded the truck with heavy trucks for loading the cargo to the harbor terminal.At the dock we pack the goods in containers
and ship them abroad.
Delivery Detail:
Shipped in 30 days after payment
Certifications:
Our Service
Pre-sales.
* Project design, performance introduction, technical agreement, contract signing, packaging * Inquiry and consulting support.
* Sample testing support.
In-sales. * We will provide you with the latest progress in the product assembly, packaging and transportation.
After-sales.
* We will provide free accessories for the damage to non - human parts. * Training how to install the machine, training how
to use the machine with video and so on * And our technical staff can go abroad to provide technical guidance.
Our Company:
Our workshop:
Customer & EXPO:
FAQ:
1. Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis/Conformance: Insurance: Origin, and other export documents where required.
2. What is the average lead time?
For samples the lead time is about 7 days. For mass production the lead time is 20-30 days after receiving the deposit payment.
The lead times become effective when (1) we have received your deposit and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
3. What kinds of payment methods do you accept?
You can make the payment to our bank account, Western Union or Alipay:30% deposit in advance, 70% balance before shipment.
4. What is the product warranty?
The warranty period is 13 months after the bill of lading date. We warranty our materials and workmanship. Our commitment is to your satisfaction with our products. In warranty or not, it is the culture of our company to address and resolve all customer issues to everyone's satisfaction.
5. Do you guarantee safe and secure delivery of products?
Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge.
6. How about the shipping fees?
The shipping cost depends on the way you choose to get the goods. Express is normally the quickest but also most expensive way. By seafreight is the best solution for big amounts. Exactly freight rates we can only give you if we know the details of amount, weight and way. Please contact us for further information.
7.Are you a manufacturer? Can we come and visit your factory?
Yes, we are manufacturer. You are welcome to visit the factory, and we will introduce the products you are interested in in detail on the spot.
Contact information: